Failed: Engineering - Zoning Final
Prior To Zoning Approval And Certificate Of Occupancy, The Following Items Must Be Corrected. 1) All Dirt And Sediment Must Be Cleaned Out Of The Right-of-way, Ditch, And Culvert. 2) All Slopes Must Be Stabilized. 3) Landscaping Must Be Continually Water As Not To Die.
Inspected by Brandon Stubbs