Permit Details

Permit Search

Permit

New Residential Construction

214 SW CHERRY BLOSSOM WAY
LAKE CITY, FL 32024

Permit #
000044044
Application #
52942
Status Completed
  1. Submitted Dec 22, 2021
  2. Issued Mar 30, 2022
  3. Expires Oct 18, 2023
  4. Completed Apr 21, 2023

Property

Parcel #
03011-126
Owner
Stanley Crawford Construction
Acres
0.30
Subdivision
Rose Pointe
Zoning
PRD
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
104'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0289D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1524
Total Area (Sqft)
2186
Building Height
18
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-1037
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Plan Review - Building Approved
  4. Plan Review - Mechanical Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Plumbing Approved
  7. Plan Review - Reviewed
  8. Zoning Review - Documents Required
  9. Zoning Review - Documents Required
  10. Zoning Review - Documents Required
  11. Zoning Review - Documents Required
  12. Zoning Review - Documents Required
  13. Zoning Review - Reviewed
  14. Final Review - Documents Required
  15. Final Review - Payment Needed
  16. Permit Issued
  17. Final Review - Payment Needed

Contractors

  • William S Crawford

    Stanley Crawford Construction Inc

    License
    RG0042896
    Title
    General Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Stephen M Brisbois

    Epic Ac Service (dba) Central Home Heating & Air Llc

    License
    CAC1819412
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor
  • Kenneth Ault

    Kenneth Edward Ault Plumbing Inc

    License
    CFC1429807
    Title
    Cert. Plumbing
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

  • Ralph W Laverdure

    Rwl Roofing Llc

    License
    CCC1328590
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Apr 27, 2022

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Apr 27, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. May 25, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  4. Jun 14, 2022

    Passed: Building - Slab

    Fiber Mesh Concrete

    Inspected by Matt Forsyth

  5. Sep 16, 2022

    Failed: Building - Framing

    Garage Endwall Detail Overlooked

    Inspected by Matt Forsyth

  6. Sep 16, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  7. Sep 16, 2022

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  8. Sep 16, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Tub Water Tested

    Inspected by Matt Forsyth

  9. Sep 16, 2022

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  10. Sep 16, 2022

    Release to power company

    Inspected by Matt Forsyth

  11. Sep 26, 2022

    Passed: Building - Insulation

    Walls Partial Ceiling

    Inspected by Matt Forsyth

  12. Sep 26, 2022

    Passed: Building - Framing

    Item Addressed

    Inspected by Matt Forsyth

  13. Mar 15, 2023

    Passed: Electrical - Permanent Power

    Septic Needed

    Inspected by Matt Forsyth

  14. Apr 17, 2023

    Release to power company

    Inspected by Melissa Garber

  15. Apr 17, 2023

    Septic Release Inspection

    Inspected by Health Dept

  16. Apr 21, 2023

    Passed: Building - Final

    Inspected by Matt Forsyth

Documents