| Application #: | 53037 |
| Permit #: |
000043665 |
| Related Permit: |
|
| Submitted: | Friday, January 7, 2022 |
| Issued: | Monday, February 7, 2022 |
| Expires: | Tuesday, July 4, 2023 |
| Completed: | |
| Status: |
Permit Issued |
| Septic Release? |
Yes |
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0513C |
| In floodway |
N |
| This is the construction of a |
Single Family Dwelling |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setback Side 2 |
25' |
| Setbacks Rear |
25' |
| Stories |
1 |
| Heated Area (Sqft) |
792 |
| Total Area (Sqft) |
2160 |
| Building Code Construction Type |
V |
| Building Code Element |
B |
| Building Code Occupancy Types |
Residential |
| Occupancy Use Title |
single family dwelling |
| Building Code Edition |
2020 Florida Building Code 7th Edition and 2017 National Electrical Code |
| Septic# (00-0000) or (X00-000) |
22-0064 |
| Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) |
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof. |
| 1/10/2022 |
Plan Review - Corrections Needed |
| 1/10/2022 |
Point Review - Received-Hard Copy Application |
| 1/10/2022 |
Point Review - Reviewed |
| 1/11/2022 |
Plan Review - Reviewed |
| 1/21/2022 |
Zoning Review - Reviewed |
| 1/21/2022 |
Final Review - Documents Required |
| 2/2/2022 |
Final Review - Documents Required |
| 2/7/2022 |
Final Review - Reviewed |
| 2/7/2022 |
Final Review - Payment Needed |
| 2/7/2022 |
Permit Issued |
| Name / Business |
License |
Title |
Role |
| Inspection |
Notes |
Performed By |
Date |
| Passed: Building - Footer |
|
Matt Forsyth |
3/7/2022 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
3/7/2022 |
| Passed: Electrical - Temporary Service |
|
Anthony Aslan |
3/22/2022 |
| Release to power company |
|
Anthony Aslan |
3/22/2022 |
| Passed: Electrical - 1st Underground Rough–In |
|
Anthony Aslan |
3/22/2022 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
3/22/2022 |
| Septic Release Inspection |
|
Health Dept |
4/1/2022 |
| Passed: Building - Framing |
|
Anthony Aslan |
5/17/2022 |
| Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
7/25/2022 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
7/25/2022 |
| Passed: Building - Insulation |
All Spray Foam |
Anthony Aslan |
8/8/2022 |
| Passed: Building - Final |
Need Final Termite |
Anthony Aslan |
1/5/2023 |