Permit Details

Permit Search

Permit

New Residential Construction

266 SW COLES CT
FORT WHITE, FL 32038

Permit #
000043649
Application #
52982
Status Completed
  1. Submitted Dec 30, 2021
  2. Issued Feb 3, 2022
  3. Expires Feb 25, 2023
  4. Completed Aug 30, 2022

Property

Parcel #
04145-014
Owner
Dube Reginald J Jr, Dube Christi D
Acres
10.06
Subdivision
Cole's Unr
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0488C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2025
Total Area (Sqft)
2822
Building Height
12
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0067
If Other, explain the use of the structure.
There is an unoccupied mobile home on the property. They plan to demo soon.
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Zoning Review - Reviewed
  4. Plan Review - Documents Required
  5. Plan Review - Corrections Needed
  6. Plan Review - Building Approved
  7. Plan Review - Electrical Approved
  8. Plan Review - Mechanical Approved
  9. Plan Review - Plumbing Approved
  10. Final Review - Documents Required
  11. Final Review - Reviewed
  12. Final Review - Payment Needed
  13. Permit Issued
  14. Permit reissued to reflect updated information.

Contractors

  • Mark J Mashburn

    Americas Home Place Inc

    License
    CRC1330787
    Title
    Residential Contractor
    Role
    Contractor

    County License & State License & Liability Insurance Expired.

  • Nate D Bazinet

    Sunshine Plumbing & Gas

    License
    CFC1427687
    Title
    Plumbing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Benjamin T Keeler

    Keeler Roofing, Llc

    License
    CCC1330509
    Title
    Cert. Roofing
    Role
    Subcontractor
  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Feb 7, 2022

    Septic Release Inspection

    Inspected by Health Dept

  2. Feb 11, 2022

    Failed: Plumbing/Gas - 1st Underground Rough–In

    No Water In Drain Pipes, No Pressure On Supply Lines

    Inspected by Anthony Aslan

  3. Feb 15, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  4. Feb 23, 2022

    Cancelled: Building - Footer

    Inspected by Anthony Aslan

  5. Feb 23, 2022

    Cancelled: Engineering - Setbacks

    Inspected by Anthony Aslan

  6. Feb 23, 2022

    Passed: Building - Monolithic Slab

    Inspected by Anthony Aslan

  7. Feb 23, 2022

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  8. Mar 29, 2022

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Anthony Aslan

  9. Mar 29, 2022

    Cancelled: Building - Rated Assembly Fastening

    Inspected by Anthony Aslan

  10. Mar 29, 2022

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  11. Mar 29, 2022

    Cancelled: Building - Wall Sheathing

    Inspected by Anthony Aslan

  12. Mar 29, 2022

    Passed: Building - Framing

    Interior Bearing Walls Not Anchored And Some Missing, Straps Missing Nails

    Inspected by Anthony Aslan

  13. Apr 19, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  14. Apr 19, 2022

    Failed: Mechanical - Rough In

    -gasket Missing On Main Return -condensate Drain Line Not Insulated -dryer Vent 90 Is T-fin Not Allowed, Dryer Pipe Must Be Smooth Internally, Also Missing Nail Guards

    Inspected by Anthony Aslan

  15. Apr 19, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  16. Apr 19, 2022

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Anthony Aslan

  17. Apr 21, 2022

    Passed: Mechanical - Rough In

    Corrections Made, Duct System Sealed From Outside Unable To Verify Internal Sealing.

    Inspected by Anthony Aslan

  18. Apr 22, 2022

    Cancelled: Mechanical - Rough In

    Inspected by Anthony Aslan

  19. Apr 28, 2022

    Passed: Building - Insulation

    Need To Get Windows Taped Up And Siding Asap For Weatherization

    Inspected by Anthony Aslan

  20. May 12, 2022

    Failed: Electrical - Permanent Power

    Not Ready

    Inspected by Anthony Aslan

  21. May 25, 2022

    Passed: Electrical - Permanent Power

    Need Pictures Of Siding Installed, House Is Not Weatherized

    Inspected by Anthony Aslan

  22. Jun 29, 2022

    Passed: Electrical - Permanent Power

    Inspected by Anthony Aslan

  23. Jun 29, 2022

    Release to power company

    Inspected by Anthony Aslan

  24. Aug 29, 2022

    Passed: Building - Final

    This Is Passed But Not Complete Until Picture Of Ahu Wire Entering Unit Is Fixed

    Inspected by Anthony Aslan

  25. Aug 30, 2022

    Certificate-Release Certificate

    Recv'd Correction

    Inspected by Anthony Aslan

Documents