Permit Details

Permit Search

Permit

New Residential Construction

290 SW BARON GLN
FORT WHITE, FL 32038

Permit #
000043488
Application #
52943
Status Completed
  1. Submitted Dec 22, 2021
  2. Issued Jan 7, 2022
  3. Expires May 20, 2023
  4. Completed Nov 21, 2022

Property

Parcel #
03752-438
Owner
Johnson Marcus Marice, Johnson Candace Tiara
Acres
4.77
Subdivision
Southern Meadows Phase 1
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
81'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0390C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2186
Total Area (Sqft)
3065
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-1038
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Zoning Review - Reviewed
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Reviewed
  9. Final Review - Reviewed
  10. Final Review - Payment Needed
  11. Permit Issued
  12. Final Review - Payment Needed

Contractors

  • William S Crawford

    Stanley Crawford Construction Inc

    License
    RG0042896
    Title
    General Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Stephen M Brisbois

    Epic Ac Service (dba) Central Home Heating & Air Llc

    License
    CAC1819412
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor
  • Kenneth Ault

    Kenneth Edward Ault Plumbing Inc

    License
    CFC1429807
    Title
    Cert. Plumbing
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

  • Ralph W Laverdure

    Rwl Roofing Llc

    License
    CCC1328590
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Jan 13, 2022

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Jan 13, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Jan 28, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  4. Feb 1, 2022

    Passed: Building - Slab

    Fiber Mesh Concrete

    Inspected by Matt Forsyth

  5. Feb 10, 2022

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  6. Feb 10, 2022

    Release to power company

    Inspected by Matt Forsyth

  7. Mar 18, 2022

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  8. Apr 18, 2022

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  9. Apr 18, 2022

    Passed: Building - Wall Sheathing

    Windstorm Osb

    Inspected by Matt Forsyth

  10. May 19, 2022

    Passed: Building - Framing

    Inspected by Matt Forsyth

  11. May 19, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  12. May 19, 2022

    Failed: Mechanical - Rough In

    Need 3inch Clearance Around Ductwork In Ahu Closet

    Inspected by Matt Forsyth

  13. May 19, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Need Water Test On Tubs

    Inspected by Matt Forsyth

  14. May 25, 2022

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  15. May 25, 2022

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Tub Water Tested

    Inspected by Matt Forsyth

  16. Jun 6, 2022

    Passed: Building - Insulation

    Need To Get Doors In Asap, Or Cover Openings Temporary.

    Inspected by Troy Crews

  17. Oct 24, 2022

    Passed: Electrical - Permanent Power

    Need Septic

    Inspected by Matt Forsyth

  18. Oct 27, 2022

    Release to power company

    Inspected by Melissa Garber

  19. Oct 27, 2022

    Septic Release Inspection

    Inspected by Health Dept

  20. Nov 17, 2022

    Failed: Building - Final

    Kitchen Countertops Require Two Branch Circuits For Receptacles Need Blower Door Test Dining Room Sliding Door Not Locking

    Inspected by Matt Forsyth

  21. Nov 21, 2022

    Passed: Building - Final

    Inspected by Troy Crews

Documents