| Passed: Engineering - Setbacks |
Tight Lot Lines Verify By Surveyor |
Anthony Aslan |
12/29/2021 |
| Passed: Building - Footer |
|
Anthony Aslan |
12/29/2021 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
1/14/2022 |
| Passed: Building - Slab |
|
Anthony Aslan |
1/18/2022 |
| Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
4/6/2022 |
| Passed: Mechanical - Rough In |
Need Nail Guard Dryer Pipe |
Anthony Aslan |
4/6/2022 |
| Passed: Plumbing/Gas - 2nd Rough-In |
No Water In Tub |
Anthony Aslan |
4/6/2022 |
| Failed: Building - Framing |
Missing Ltt Straps On Garage, Need Letter Garage Double Bottom Plate On Plans, Electrical Service Entrance Wire More Than 50% Bearing Top Plate Notched Or Drilled |
Anthony Aslan |
4/6/2022 |
| Passed: Building - Framing |
Waiting On Bottom Plate Letter |
Anthony Aslan |
4/21/2022 |
| Passed: Building - Insulation |
Inspected 4-21-22 Walls Only |
Anthony Aslan |
4/22/2022 |
| Septic Release Inspection |
|
Health Dept |
6/27/2022 |
| Cancelled: Electrical - Permanent Power |
|
Melissa Garber |
6/28/2022 |
| Passed: Electrical - Permanent Power |
Need Driveway Final- Rec'd |
Anthony Aslan |
6/29/2022 |
| Release to power company |
|
Melissa Garber |
7/6/2022 |
| Passed: Building - Final |
Need Blower Door Test |
Anthony Aslan |
8/12/2022 |
| Certificate-Release Certificate |
Recv'd Blower Door Test |
Anthony Aslan |
8/15/2022 |