Permit Details

Permit Search

Permit

Roof Replacement or Repair

314 SW DRAGONFLY CT
LAKE CITY, FL 32024

Permit #
000043397
Application #
52840
Status Completed
  1. Submitted Dec 14, 2021
  2. Issued Dec 16, 2021
  3. Expires Jul 23, 2022
  4. Completed Jan 24, 2022

Property

Parcel #
02434-213
Owner
Corn Cheryl Denise
Acres
1.28
Subdivision
Cypress Lake Phase 3
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0290D
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Remove existing roof and install asphalt shingles.
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
4900
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL5444-R16
Product Manufacturer
Certainteed
Product Description
3-tab, 4-tab, strip (no-cut-outs), laminated and architectural asphalt roof shingles
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Mineral Surface
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Final Review - Corrections Needed
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Daniel Dufresne

    Covenant Roofing & Construction Inc

    License
    CCC1332763
    Title
    Cert. Roofing
    Role
    Contractor

Inspections

  1. Dec 20, 2021

    Cancelled: Re-Roof - In Progress

    Inspected by Melissa Garber

  2. Dec 30, 2021

    Failed: Re-Roof - In Progress

    Material On Site Work Not Started

    Inspected by Matt Forsyth

  3. Jan 4, 2022

    Passed: Re-Roof - In Progress

    Inspected by Matt Forsyth

  4. Jan 24, 2022

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth