Permit
305 SW GRANITE CTLAKE CITY, FL 32024
Ryan K Lee
Rk Lee Electric Llc
County License & State License & Liability Insurance & Workers Comp Expired.
Curtis Graddy
Curtis Graddy Plumbing Llc
County License & State License & Liability Insurance Expired.
Robert Jarvis
Jarvis Heat And Air Llc
County License & State License Expired.
Dustin Busscher
Busscher Enterprises Llc Dba Jbc Builders
Passed: Plumbing/Gas - 1st Underground Rough–In
Need Engineered Letter For Floor Elevation If Not 1 Foot Above Rd
Inspected by Matt Forsyth
Passed: Electrical - Temporary Service
Release to power company
Cancelled: Building - Masonry Wall Reinforcing
Inspected by Troy Crews
Cancelled: Building - Slab
Failed: Building - Monolithic Slab
Foundation Does Not Match Plans, Need New Plans, Also Need Engineering Letter On Elevation Or Confirmation Of One Foot Above Road For Finished Slab
Cancelled: Engineering - Setbacks
Passed: Building - Monolithic Slab
Need Two #5bars At Bs1
Passed: Engineering - Setbacks
Failed: Plumbing/Gas - 2nd Rough-In
Nothing Ready Only Slab
Failed: Plumbing/Gas - Tub Set/Shower Pan
Cancelled: Building - Wall Sheathing
Inspected by Melissa Garber
Passed: Building - Lintel/Tie Beam
Passed: Building - Masonry Wall Reinforcing
Passed: Building - Vertical Cells/Columns
Rescheduled 9/23/2022:Building - Framing
Inspected by Emaleigh Williams
Rescheduled 9/23/2022:Building - Strapping
Rescheduled 9/26/2022:Building - Framing
Rescheduled 9/26/2022:Building - Strapping
Rescheduled 9/28/2022:Building - Framing
Cancelled: Building - Strapping
Cancelled: Building - Framing
Candy - Called To Cancel
Rescheduled 10/7/2022:Building - Framing
Rescheduled 10/7/2022:Building - Strapping
Passed: Building - Strapping
Passed: Building - Roof Decking
Failed: Building - Framing
Contractor Working Items To Be Addressed
Need Letter From Engineer How To Hold Trusses Down
Passed: Mechanical - Rough In
Passed: Plumbing/Gas - 2nd Rough-In
Cancelled: Electrical - Permanent Power
Passed: Electrical - 2nd Rough-In
Passed: Building - Wall Sheathing
Septic Release Inspection
Inspected by Health Dept
Passed: Electrical - Permanent Power
Driveway Release Needed
Failed: Building - Final
Talked To Owner On Things Needed For Co
Passed: Building - Final