Permit Details

Permit Search

Permit

Roof Replacement or Repair

1139 SW WENDY TER
LAKE CITY, FL 32025

Permit #
000043042
Application #
52293
Status Completed
  1. Submitted Oct 26, 2021
  2. Issued Oct 26, 2021
  3. Expires May 4, 2022
  4. Completed Nov 5, 2021

Property

Parcel #
08940-003
Owner
Sanders Kelli & Leon E
Acres
1.12
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0401C
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Remove existing roof and install Asphalt Shingles
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
4100
No. of Stories
1
Roof Pitch
2:12 to 4:12
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL5444-R16
Product Manufacturer
Certainteed
Product Description
3-tab, 4-tab, strip (no-cut-outs), laminated and architectural asphalt roof shingles
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Repair Existing
Drip Edge:
Repair Existing
Valley Treatment:
New Metal
Second Roof Pitch (if applicable)
2:12 to 4:12
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Final Review - Payment Needed
  3. Permit Issued

Contractors

  • Daniel Dufresne

    Covenant Roofing & Construction Inc

    License
    CCC1332763
    Title
    Cert. Roofing
    Role
    Contractor

Inspections

  1. Oct 28, 2021

    Failed: Re-Roof - In Progress

    Not Started

    Inspected by Troy Crews

  2. Oct 28, 2021

    Cancelled: Re-Roof - In Progress

    Inspected by Troy Crews

  3. Oct 29, 2021

    Passed: Re-Roof - In Progress

    Inspected by Troy Crews

  4. Nov 5, 2021

    Passed: Re-Roof - Final

    Inspected by Troy Crews