Status Completed
  1. Submitted Aug 17, 2021
  2. Issued Sep 3, 2021
  3. Expires Oct 4, 2022
  4. Completed Apr 7, 2022

Property

Parcel #
08631-110
Owner
Crowther Richard A Irrevocable Special Needs Trust
Acres
4.92
Subdivision
Creek Run Plantation
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
101'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0313D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1807
Total Area (Sqft)
2463
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0624
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Zoning Review - Documents Required
  5. Zoning Review - Reviewed
  6. Zoning Review - Documents Required
  7. Plan Review - Documents Required
  8. Plan Review - Plumbing Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Electrical Approved
  11. Plan Review - Building Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Corrections Needed
  14. Zoning Review - Reviewed
  15. Final Review - Payment Needed
  16. Permit Issued
  17. Final Review - Payment Needed

Contractors

  • Joann T Lev

    Exceptions Realty Llc

    License
    CRC1329719
    Title
    Cert. Residential
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Dana D Johnson

    Mac Johnson Roofing Inc Dba Gulf Coast Metal Roofing

    License
    CCC1325497
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License & Liability Insurance Expired.

  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Anthony R Franks

    Franks & Lane Heating And Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Sep 7, 2021

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  2. Sep 7, 2021

    Release to power company

    Inspected by Matt Forsyth

  3. Sep 21, 2021

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  4. Sep 21, 2021

    Passed: Building - Footer

    Need Grounding Wire On Rebar

    Inspected by Anthony Aslan

  5. Oct 8, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  6. Oct 12, 2021

    Passed: Building - Slab

    Inspected by Anthony Aslan

  7. Oct 26, 2021

    Passed: Building - Masonry Wall Reinforcing

    Inspected by Anthony Aslan

  8. Dec 8, 2021

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  9. Dec 15, 2021

    Failed: Building - Framing

    Nails Missing On Straps, Red Marker Arrows.

    Inspected by Anthony Aslan

  10. Jan 11, 2022

    Passed: Building - Framing

    Corrections Made

    Inspected by Anthony Aslan

  11. Jan 11, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  12. Jan 11, 2022

    Passed: Mechanical - Rough In

    Check Dryer Box At Insulation

    Inspected by Anthony Aslan

  13. Jan 11, 2022

    Failed: Plumbing/Gas - 2nd Rough-In

    No Pressure On System

    Inspected by Anthony Aslan

  14. Jan 18, 2022

    Passed: Building - Insulation

    Inspected by Anthony Aslan

  15. Feb 11, 2022

    Cancelled: Mechanical - Rough In

    Inspected by Anthony Aslan

  16. Feb 11, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  17. Feb 11, 2022

    Passed: Electrical - Permanent Power

    Inspected by Anthony Aslan

  18. Feb 11, 2022

    Release to power company

    Inspected by Anthony Aslan

  19. Apr 6, 2022

    Failed: Building - Final

    Need Make Up Air Automatic Damper, Blower Door Test 1.9 Requires need Disconnect Or Lockout For Water Heater And Air Handler Breaker Panel Not With In Sight. need Bollard For Water Heater And Air Handler In Garage.

    Inspected by Anthony Aslan

  20. Apr 7, 2022

    Passed: Building - Final

    Rec'd Pictures

    Inspected by Anthony Aslan

  21. Apr 27, 2022

    Septic Release Inspection

    Inspected by Health Dept

Documents