Permit Details

Permit Search

Permit

Mobile Home

754 SW CUMORAH HILL ST
FORT WHITE, FL 32038

Permit #
000042683
Application #
50211
Status Completed
  1. Submitted Aug 7, 2021
  2. Issued Sep 3, 2021
  3. Expires May 9, 2022
  4. Completed Nov 10, 2021

Property

Parcel #
09698-019
Owner
Way Pamela R
Acres
5.00
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0485C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2021
Width (Ft.In)
26
Length (Ft.In)
48
Driveway access to home:
Existing Drive
Installation Decal #
65812
Special temporary use permit number:
2108-50
Septic #
21-0693
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
LOHGA20036367AB
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Plan Review - Reviewed
  5. Zoning Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Payment Needed
  8. Permit Issued

Contractors

  • Brent M Strickland

    License
    IH1104218
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Oct 29, 2021

    Septic Release Inspection

    Inspected by Health Dept

  2. Nov 9, 2021

    Cancelled: Building - Footer

    Inspected by Troy Crews

  3. Nov 9, 2021

    Cancelled: Engineering - Setbacks

    Inspected by Troy Crews

  4. Nov 9, 2021

    Cancelled: Building - Vertical Cells/Columns

    Inspected by Troy Crews

  5. Nov 10, 2021

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  6. Nov 10, 2021

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Anthony Aslan

  7. Nov 10, 2021

    Release to power company

    Inspected by Anthony Aslan