Permit Details

Permit Search

Permit

Mobile Home

1084 SW DAISY RD
LAKE CITY, FL 32024

Permit #
000042648
Application #
50084
Status Completed
  1. Submitted Jan 31, 2022
  2. Issued Aug 30, 2021
  3. Expires Aug 23, 2022
  4. Completed Feb 24, 2022

Property

Parcel #
00468-003
Owner
Fletcher Patrick & Debra
Acres
6.34
Subdivision
—
Zoning
ESA-2
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0370C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2022
Width (Ft.In)
28
Length (Ft.In)
68
Driveway access to home:
Culvert Waiver
Installation Decal #
82041
Septic #
21-0656
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
Jacfl001424ab
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Point Review - Printed-Online Application
  2. Point Review - Reviewed
  3. Plan Review - Reviewed
  4. Zoning Review - Reviewed
  5. Final Review - Documents Required
  6. Permit Issued

Contractors

  • Rusty L Knowles

    Floridas Finest Mobile Home Set Up

    License
    IH1038219
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor

Inspections

  1. Feb 16, 2022

    Failed: Mobile Home - Mobile Home Set-Up Final

    Need Bonding Wire Connected Also To Release Power Needs Septic Release

    Inspected by Matt Forsyth

  2. Feb 16, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Feb 22, 2022

    Septic Release Inspection

    Inspected by Health Dept

  4. Feb 24, 2022

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Matt Forsyth

  5. Feb 24, 2022

    Release to power company

    Inspected by Matt Forsyth

  6. Feb 24, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth