Permit Details

Permit Search

Permit

New Residential Construction

192 SW RIVER RISE CT
FORT WHITE, FL 32038

Permit #
000042616
Application #
50012
Status Completed
  1. Submitted Oct 29, 2021
  2. Issued Sep 9, 2021
  3. Expires Jun 18, 2023
  4. Completed Jan 5, 2023

Property

Parcel #
10021-016
Owner
Flynn David P
Acres
12.72
Subdivision
Bussey Glen Unr
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
61.00'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0495C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1024
Total Area (Sqft)
1264
Building Height
15
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0626
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Zoning Review - Documents Required
  3. Zoning Review - Documents Required
  4. Zoning Review - Documents Required
  5. Plan Review - Documents Required
  6. Plan Review - Plumbing Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Mechanical Approved
  9. Plan Review - Electrical Approved
  10. Plan Review - Building Approved
  11. Plan Review - Reviewed
  12. Zoning Review - Reviewed
  13. Final Review - Complete
  14. Permit Issued
  15. Permit reissued to reflect updated information.
  16. Final Review - Payment Needed

Contractors

This is an owner-builder project.

  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Donald R Davis

    High Springs Electric Inc

    License
    CAC1815367
    Title
    Class B A/c
    Role
    Subcontractor
  • George N Degler Jr

    A Proud Plumber Llc

    License
    CFC1427133
    Title
    Plumbing Contractor
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Oct 6, 2021

    Failed: Plumbing/Gas - 1st Underground Rough–In

    Air Trapped In Toilets And Other Stub Ups.

    Inspected by Anthony Aslan

  2. Oct 8, 2021

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Anthony Aslan

  3. Oct 8, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  4. Oct 14, 2021

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  5. Oct 14, 2021

    Passed: Building - Monolithic Slab

    Inspected by Anthony Aslan

  6. Oct 22, 2021

    Passed: Building - Slab

    Inspected by Anthony Aslan

  7. Mar 29, 2022

    Failed: Building - Roof Decking

    Check Nails Lose Sheathing

    Inspected by Anthony Aslan

  8. Mar 29, 2022

    Failed: Building - Wall Sheathing

    Marked Red Missing Nails

    Inspected by Anthony Aslan

  9. Mar 31, 2022

    Passed: Building - Roof Decking

    Corrections Made

    Inspected by Anthony Aslan

  10. Mar 31, 2022

    Passed: Building - Wall Sheathing

    Corrections Made

    Inspected by Anthony Aslan

  11. Apr 14, 2022

    Failed: Building - Framing

    Need Stud Packs Under Doubled Truss

    Inspected by Anthony Aslan

  12. Apr 20, 2022

    Passed: Building - Framing

    Corrections Made

    Inspected by Anthony Aslan

  13. Jun 2, 2022

    Failed: Plumbing/Gas - 2nd Rough-In

    R602.6drilling And Notching Of Studs. drilling And Notching Of Studs Shall Be In Accordance With The Following: 1.notching. Any Stud In An Exterior Wall Or Bearing Partition Shall Be Permitted To Be Cut Or Notched To A Depth Not Exceeding 25 Percent Of Its Width. Studs In Nonbearing Partitions Shall Be Permitted To Be Notched To A Depth Not To Exceed 40 Percent Of A Single Stud Width. 2.drilling. Any Stud Shall Be Permitted To Be Bored Or Drilled, Provided That The Diameter Of The Resulting Hole Is Not More Than 60 Percent Of The Stud Width, The Edge Of The Hole Is Not More Than 5/8 Inch (16 Mm) To The Edge Of The Stud, And The Hole Is Not Located In The Same Section As A Cut Or Notch. Studs Located In Exterior Walls Or Bearing Partitions Drilled Over 40 Percent And Up To 60 Percent Shall Be Doubled With Not More Than Two Successive Doubled Studs Bored. See Figures R602.6(1) And R602.6(2).

    Inspected by Anthony Aslan

  14. Jun 2, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  15. Jun 2, 2022

    Failed: Mechanical - Rough In

    M1501.1outdoor Discharge. the Air Removed By Every Mechanical Exhaust System Shall Be Discharged To The Outdoors In Accordance With Section M1506.3. Air Shall Not Be Exhausted Into An Attic, Soffit, Ridge Vent Or Crawl Space. m1506.3exhaust Openings. air Exhaust Openings Shall Terminate Not Less Than 3 Feet (914 Mm) From Property Lines; 3 Feet (914 Mm) From Operable And Nonoperable Openings Into The Building And 10 Feet (3048 Mm) From Mechanical Air Intakes Except Where The Opening Is Located 3 Feet (914 Mm) Above The Air Intake. Openings Shall Comply With Sections R303.5.2 And R303.6. m1305.1.3appliances In Attics. attics Containing Appliances Shall Be Provided With An Opening And A Clear And Unobstructed Passageway Large Enough To Allow Removal Of The Largest Appliance, But Not Less Than 30 Inches (762 Mm) High And 22 Inches (559 Mm) Wide And Not More Than 20 Feet (6096 Mm) Long Measured Along The Centerline Of The Passageway From The Opening To The Appliance. The Passageway Shall Have Continuous Solid Flooring In Accordance With Chapter 5 Not Less Than 24 Inches (610 Mm) Wide. A Level Service Space Not Less Than 30 Inches (762 Mm) Deep And 30 Inches (762 Mm) Wide Shall Be Present Along All Sides Of The Appliance Where Access Is Required. The Clear Access Opening Dimensions Shall Be Not Less Than Of 20 Inches By 30 Inches (508 Mm By 762 Mm), And Large Enough To Allow Removal Of The Largest Appliance.

    Inspected by Anthony Aslan

  16. Jun 7, 2022

    Passed: Mechanical - Rough In

    Check Bath Vent At Final Location

    Inspected by Anthony Aslan

  17. Jun 7, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Need Letter For Stud With T Brace.

    Inspected by Anthony Aslan

  18. Jun 13, 2022

    Passed: Building - Insulation

    Inspected by Anthony Aslan

  19. Nov 16, 2022

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Anthony Aslan

  20. Nov 30, 2022

    Release to power company

    Inspected by Melissa Garber

  21. Nov 30, 2022

    Septic Release Inspection

    Inspected by Health Dept

  22. Dec 20, 2022

    Passed: Building - Final

    Need Breaker Lock Out On A/c Breaker, Seal Tight On Wall And Duct Wire Outside, Fresh Air

    Inspected by Anthony Aslan

  23. Jan 5, 2023

    Certificate-Release Certificate

    Rec'cd Pictures Of Corrections

    Inspected by Anthony Aslan

Documents