Permit Details

Permit Search

Permit

New Residential Construction

826 NW ASH DR
LAKE CITY, FL 32055

Permit #
000042553
Application #
49944
Status Completed
  1. Submitted Jul 15, 2021
  2. Issued Aug 16, 2021
  3. Expires Sep 17, 2025
  4. Completed Mar 21, 2025

Property

Parcel #
02215-014
Owner
Hadley John
Acres
9.05
Subdivision
—
Zoning
A-3
Flood zone
A
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0280D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
768
Total Area (Sqft)
928
Building Height
20
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0576
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Zoning Review - Reviewed
  5. Plan Review - Plumbing Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Electrical Approved
  8. Plan Review - Building Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Reviewed
  11. Final Review - Reviewed
  12. Final Review - Payment Needed
  13. Permit Issued
  14. Final Review - Payment Needed

Contractors

No contractors are listed on this permit.

Inspections

  1. Aug 18, 2021

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  2. Aug 18, 2021

    Release to power company

    Inspected by Matt Forsyth

  3. Aug 18, 2021

    Cancelled: Electrical - Temporary Service

    Inspected by Troy Crews

  4. Jan 11, 2022

    Passed: Building - Footer

    Inspected by Troy Crews

  5. Jan 11, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  6. Jun 9, 2022

    Passed: Building - Lintel/Tie Beam

    Stem Walls

    Inspected by Troy Crews

  7. Jun 9, 2022

    Passed: Building - Masonry Wall Reinforcing

    Inspected by Troy Crews

  8. Nov 23, 2022

    Passed: Building - Framing

    Floor Framing

    Inspected by Troy Crews

  9. Nov 23, 2022

    Cancelled: Building - Slab

    Inspected by Troy Crews

  10. Apr 3, 2023

    Passed: Building - Framing

    Inspected by Troy Crews

  11. Apr 3, 2023

    Passed: Building - Wall Sheathing

    Inspected by Troy Crews

  12. Apr 19, 2023

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  13. Oct 2, 2023

    Passed: Building - Rated Assembly Fastening

    Inspected by Troy Crews

  14. Mar 8, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  15. Mar 8, 2024

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Troy Crews

  16. Mar 8, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  17. Jun 27, 2024

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Troy Crews

  18. Jun 27, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  19. Oct 7, 2024

    Passed: Electrical - Permanent Power

    Inspected by Troy Crews

  20. Oct 7, 2024

    Passed: Building - Insulation

    Inspected by Troy Crews

  21. Oct 7, 2024

    Septic Release Inspection

    Inspected by Health Dept

  22. Oct 8, 2024

    Release to power company

    Inspected by Troy Crews

  23. Mar 19, 2025

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  24. Mar 21, 2025

    Certificate-Release Certificate

    Inspected by Troy Crews

  25. Mar 21, 2025

    Passed: Building - Final

    Inspected by Troy Crews

Documents