Permit Details

Permit Search

Permit

New Residential Construction

206 SE SANDIA WAY
LAKE CITY, FL 32025

Permit #
000042440
Application #
49716
Status Final Review - Payment Needed This permit expired on May 9, 2023.
  1. Submitted Oct 22, 2021
  2. Issued Jul 29, 2021
  3. Expires May 9, 2023
  4. Completed —

Property

Parcel #
08382-066
Owner
Todd Frank A Iii & Todd Joshua & Rebecca Todd
Acres
0.54
Subdivision
Glenwood Unit 2
Zoning
RSF-2
Flood zone
AH
District
5

Permit

Status
Final Review - Payment Needed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Special Flood Hazard Area
Finished floor requirement
105.5
Requirement needed
By Permanent Power Inspection
Document needed is
an Elevation Certificate for Finished Construction
Document receieved
Yes
Fema map number
12023C0313D
Water source
Ponding
In floodway
N
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
This is the construction of a
Single Family Dwelling
Heated Area (Sqft)
1610
Total Area (Sqft)
2464
Stories
1
Building Height
16
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Septic# (00-0000) or (X00-000)
21-0344
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code

Status & Review History

  1. Application Converted
  2. Point Review - Received-Hard Copy Application
  3. Point Review - Reviewed
  4. Zoning Review - Corrections Needed
  5. Plan Review - Processing
  6. Plan Review - Plumbing Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Mechanical Approved
  9. Plan Review - Electrical Approved
  10. Plan Review - Building Approved
  11. Plan Review - Reviewed
  12. Zoning Review - Reviewed
  13. Final Review - Reviewed
  14. Final Review - Payment Needed
  15. Permit Issued
  16. Final Review - Payment Needed

Contractors

  • Frank A Todd Iii(mike)

    Mike Todd Construction Inc

    License
    CGC006209
    Title
    General Contractor
    Role
    Contractor
  • Marcus Matthews

    Matthews Electric Llc

    License
    EC13005459
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Derrick L Williams

    Dl Williams Heating & Cooling Llc

    License
    CAC1816913
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor
  • Don C Bills Sr

    Hometown Plumbing Services Llc

    License
    CFC1428890
    Title
    Plumbing Contractor
    Role
    Subcontractor

Inspections

  1. Sep 27, 2021

    Passed: Electrical - Temporary Service

    Inspected by Anthony Aslan

  2. Sep 27, 2021

    Release to power company

    Inspected by Anthony Aslan

  3. Oct 22, 2021

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  4. Oct 22, 2021

    Failed: Building - Footer

    Need Compaction Test

    Inspected by Anthony Aslan

  5. Oct 29, 2021

    Cancelled: Building - Footer

    Inspected by Melissa Garber

  6. Oct 29, 2021

    Cancelled: Engineering - Setbacks

    Inspected by Melissa Garber

  7. Nov 8, 2021

    Failed: Building - Footer

    Got Compaction, Rebar Not In Trench

    Inspected by Anthony Aslan

  8. Nov 12, 2021

    Cancelled: Building - Lintel/Tie Beam

    Inspected by Melissa Garber

  9. Nov 17, 2021

    Passed: Building - Footer

    Pictures Sent With Steel In Place

    Inspected by Troy Crews

  10. Nov 17, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  11. Dec 22, 2021

    Cancelled: Building - Vertical Cells/Columns

    Inspected by Anthony Aslan

  12. Dec 22, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  13. Jan 6, 2022

    Passed: Building - Slab

    Inspected by Anthony Aslan

  14. Jan 28, 2022

    Failed: Building - Framing

    Not Ready

    Inspected by Troy Crews

  15. Jan 28, 2022

    Cancelled: Building - Rated Assembly Fastening

    Inspected by Troy Crews

  16. Jan 28, 2022

    Failed: Building - Roof Decking

    Not Complete

    Inspected by Troy Crews

  17. Jan 28, 2022

    Failed: Building - Strapping

    Not Completed

    Inspected by Troy Crews

  18. Jan 28, 2022

    Passed: Building - Wall Sheathing

    Inspected by Troy Crews

  19. Mar 2, 2022

    Cancelled: Building - Rated Assembly Fastening

    Inspected by Anthony Aslan

  20. Mar 2, 2022

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  21. Mar 2, 2022

    Failed: Plumbing/Gas - 2nd Rough-In

    No Pressure On Piping

    Inspected by Anthony Aslan

  22. Mar 2, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  23. Mar 2, 2022

    Failed: Building - Framing

    Anchors Missing On Bottom Plate And On Splices Of Bottom Plate. Electrical Service Feed More Than 50% Of Bearing Top Plate Needs Cts218. Porch Beams Can't Verify Strapping. Corner Jack Truss No H2.5's On Any. t05, T06 Missing Laterial Engineering, T20 High Up Lift Strapping Not Adequate, T26 Missing Stud Packs.

    Inspected by Anthony Aslan

  24. Mar 2, 2022

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Inspected by Anthony Aslan

  25. Mar 9, 2022

    Failed: Building - Ext Strapping/Wall Sheathing

    Make Appointment To Meet On Site

    Inspected by Anthony Aslan

  26. Mar 9, 2022

    Failed: Building - Framing

    Make Appointment To Meet On Site

    Inspected by Anthony Aslan

  27. Apr 18, 2022

    Passed: Building - Rated Assembly Fastening

    Inspected by Anthony Aslan

  28. Apr 18, 2022

    Passed: Building - Strapping

    Inspected by Anthony Aslan

  29. Apr 18, 2022

    Passed: Building - Framing

    Inspected by Anthony Aslan

  30. Aug 12, 2022

    Septic Release Inspection

    Inspected by Health Dept

  31. Aug 30, 2022

    Cancelled: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  32. Aug 30, 2022

    Passed: Electrical - Permanent Power

    Need Driveway Final

    Inspected by Anthony Aslan

  33. Sep 8, 2022

    Release to power company

    Inspected by Melissa Garber

  34. Sep 27, 2022

    Release to power company

    Changed Pwr Companies From Fpl To Clay Per Mike Todd

    Inspected by Emaleigh Williams

  35. Nov 10, 2022

    Passed: Building - Final

    A/c Locking Caps hose Bib Back Flow kitchen Gfci Sink Side All Outlets Not Tripping

    Inspected by Anthony Aslan

Documents