Permit Details

Permit Search

Permit

Mobile Home

2886 SW MAYO RD
LAKE CITY, FL 32024

Permit #
000042403
Application #
49024
Status Completed
  1. Submitted Apr 13, 2021
  2. Issued Jul 26, 2021
  3. Expires Mar 1, 2022
  4. Completed Sep 8, 2021

Property

Parcel #
00314-004
Owner
Johnson Michaela N
Acres
5.01
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0270C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2021
Width (Ft.In)
32
Length (Ft.In)
80
Driveway access to home:
Existing Drive
Installation Decal #
77802
Special temporary use permit number:
STUP 21 04-30
Septic #
21-0350
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
fl261-00p-H--a103991ab
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Plan Review - Reviewed
  4. Zoning Review - Reviewed
  5. Final Review - Documents Required
  6. Final Review - Contact the Building Dept
  7. Final Review - Payment Needed
  8. Permit Issued

Contractors

  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Robert D Sheppard

    Melvins Mobile Home Service

    License
    IH1025386
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & Liability Insurance Expired.

Inspections

  1. Sep 2, 2021

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic Release

    Inspected by Matt Forsyth

  2. Sep 2, 2021

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Sep 8, 2021

    Release to power company

    Inspected by Melissa Garber

  4. Sep 8, 2021

    Certificate-Release Certificate

    Inspected by Matt Forsyth

  5. Sep 8, 2021

    Septic Release Inspection

    Inspected by Health Dept