Permit Details

Permit Search

Permit

Mobile Home

248 SW CHAP DR
FORT WHITE, FL 32038

Permit #
000042386
Application #
49945
Status Completed
  1. Submitted —
  2. Issued Jul 22, 2021
  3. Expires Apr 18, 2022
  4. Completed Oct 20, 2021

Property

Parcel #
04103-008
Owner
Arganbright Cari L
Acres
5.90
Subdivision
Arrow Wood
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0495C
In floodway
N
Mobile Home is a:
Single Wide
Year Built
1990
Width (Ft.In)
12
Length (Ft.In)
60
Driveway access to home:
Existing Drive
Installation Decal #
79419
Septic #
21-0583
Setbacks Front
30
Setback Side 1
25
Setbacks Rear
25
Dev Permit #
F023-
Setback Side 2
25
Are you applying for a 5 year temporary permit?
No
Serial #
10l21482
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Zoning Review - Reviewed
  4. Plan Review - Reviewed
  5. Point Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Payment Needed
  8. Permit Issued

Contractors

  • Richard Rayborn

    Sams Mobile Home Service

    License
    IH1025436-1
    Title
    Mh Installer (ih)
    Role
    Contractor

Inspections

  1. Jul 20, 2021

    Septic Release Inspection

    Inspected by Health Dept

  2. Jul 21, 2021

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Need Hole By Front And Back Door In Floor Fix

    Inspected by Anthony Aslan

  3. Sep 7, 2021

    Failed: Mobile Home - Mobile Home Set-Up Final

    No Complete, Septic, Water, Electric Not Hooked Up. No Stairs At Front Or Back Door

    Inspected by Anthony Aslan

  4. Sep 7, 2021

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  5. Oct 8, 2021

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  6. Oct 8, 2021

    Failed: Mobile Home - Mobile Home Set-Up Final

    Need To Have Septic Pipe Run To Septic, Electrical Run To Panel, Water Connected To Trailer. A/c Installed Before It Can Be Finalized

    Inspected by Anthony Aslan

  7. Oct 20, 2021

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  8. Oct 20, 2021

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Anthony Aslan

  9. Oct 20, 2021

    Release to power company

    Inspected by Anthony Aslan