Permit Details

Permit Search

Permit

New Residential Construction

409 SW BUFFALO CT
FORT WHITE, FL 32038

Permit #
000042252
Application #
49443
Status Completed
  1. Submitted May 27, 2021
  2. Issued Jul 1, 2021
  3. Expires Nov 1, 2022
  4. Completed May 5, 2022

Property

Parcel #
03935-023
Owner
Roach Sue
Acres
6.40
Subdivision
Arrow Head Acres
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0485C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30
Setback Side 1
25
Setback Side 2
25
Setbacks Rear
25
Stories
1
Heated Area (Sqft)
1073
Total Area (Sqft)
1073
Building Height
13
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0501
If Other, explain the use of the structure.
Existing mobile home will be removed within 30 days of new home completion
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Application pending.
  2. Point Review - On Hold-Incomplete
  3. Point Review - Printed-Online Application
  4. Zoning Review - Reviewed
  5. Plan Review - Building Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Mechanical Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Reviewed
  11. Final Review - Reviewed
  12. Final Review - Payment Needed
  13. Permit Issued

Contractors

  • Rodney D Wade

    Wade Custom Homes Inc

    License
    CRC1331070
    Title
    Cert. Residential
    Role
    Contractor

    County License & State License & Workers Comp Expired.

  • James Butler Jr

    Butler Plumbing Of Gainesville Inc

    License
    CFC057960
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Paula E Kennedy

    Gainesville Roofing & Co Inc

    License
    CCC1328678
    Title
    Cert. Roofing
    Role
    Subcontractor

    County License & State License & Workers Comp Expired.

  • Jack E Spann Jr

    Creative Designs Electric Lllp

    License
    ER0004625
    Title
    Reg. Electrical
    Role
    Subcontractor

    County License & State License & Workers Comp Expired.

  • Jonathan E Spann

    Spann's Heating & Air Conditioning Inc

    License
    CAC1815959
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Jul 14, 2021

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  2. Jul 14, 2021

    Passed: Building - Footer

    Inspected by Anthony Aslan

  3. Aug 19, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Laundry Trap In Slab

    Inspected by Anthony Aslan

  4. Aug 25, 2021

    Passed: Building - Slab

    Need Concrete Tickets Showing Fiber Mesh.

    Inspected by Anthony Aslan

  5. Sep 29, 2021

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  6. Sep 29, 2021

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  7. Dec 6, 2021

    Failed: Building - Framing

    Need J-bolts Other Each Side Of Girder Truss Stud Pack.

    Inspected by Anthony Aslan

  8. Dec 6, 2021

    Failed: Electrical - 2nd Rough-In

    Need Cts218 Strap On Top Plate Service Wire, More Than 50% Of Top Plate Cut

    Inspected by Anthony Aslan

  9. Dec 6, 2021

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  10. Dec 6, 2021

    Failed: Plumbing/Gas - Tub Set/Shower Pan

    Need Cts218 Strap Master Bath Vent Stack, More Than 50% Of Top Plate Cut

    Inspected by Anthony Aslan

  11. Dec 13, 2021

    Failed: Electrical - 2nd Rough-In

    Gate Locked

    Inspected by Troy Crews

  12. Dec 13, 2021

    Failed: Plumbing/Gas - 2nd Rough-In

    Gate Locked

    Inspected by Troy Crews

  13. Dec 15, 2021

    Cancelled: Mechanical - Rough In

    Inspected by Anthony Aslan

  14. Dec 15, 2021

    Passed: Electrical - 1st Underground Rough–In

    Correction Made

    Inspected by Anthony Aslan

  15. Dec 15, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Correction Made

    Inspected by Anthony Aslan

  16. Dec 15, 2021

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Anthony Aslan

  17. Dec 15, 2021

    Passed: Building - Framing

    Corrections Made

    Inspected by Anthony Aslan

  18. Dec 21, 2021

    Failed: Building - Insulation

    Not Completed, Insulator Still Working

    Inspected by Anthony Aslan

  19. Dec 22, 2021

    Passed: Building - Insulation

    Fill In Trench

    Inspected by Anthony Aslan

  20. Feb 21, 2022

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Anthony Aslan

  21. Mar 10, 2022

    Release to power company

    Inspected by Melissa Garber

  22. Mar 10, 2022

    Septic Release Inspection

    Inspected by Health Dept

  23. Apr 29, 2022

    Failed: Building - Final

    No Bower Door Test, Outlet In Master Bath Not Properly Safety Off, A/c Condenser Must Have 4" In. Exposed On Pad, Missing Return Grill, Door Gaskets Missing

    Inspected by Anthony Aslan

  24. May 5, 2022

    Passed: Building - Final

    Corrections Made

    Inspected by Anthony Aslan

Documents