Permit Details

Permit Search

Permit

New Residential Construction

1146 SW MANDIBA DR
LAKE CITY, FL 32024

Permit #
000042056
Application #
49163
Status Completed
  1. Submitted Oct 19, 2021
  2. Issued Jun 1, 2021
  3. Expires Jul 4, 2022
  4. Completed Jan 5, 2022

Property

Parcel #
09280-164
Owner
M F Butler Homes Llc
Acres
1.03
Subdivision
Oaks Of Lake City Phase 2
Zoning
PRRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
76'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0395C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30
Setback Side 1
25
Setback Side 2
25
Setbacks Rear
25
Stories
1
Heated Area (Sqft)
2378
Total Area (Sqft)
3342
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0442
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Received-Hard Copy Application
  3. Zoning Review - Reviewed
  4. Plan Review - Reviewed
  5. Zoning Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Payment Needed
  8. Permit Issued
  9. Final Review - Payment Needed

Contractors

  • Mark Bauer

    Gibraltar Contracting Llc

    License
    CBC1259633
    Title
    Cert Building
    Role
    Contractor

    County License & State License Expired.

  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor
  • James Butler Jr

    Butler Plumbing Of Gainesville Inc

    License
    CFC057960
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Jeffrey Bokor

    Dwc Contracting Llc

    License
    CCC1329756
    Title
    Roofing Contractor
    Role
    Subcontractor

    Liability Insurance Expired.

Inspections

  1. Jun 8, 2021

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Jun 8, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Jun 30, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  4. Jun 30, 2021

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  5. Jun 30, 2021

    Release to power company

    Inspected by Troy Crews

  6. Jul 6, 2021

    Passed: Building - Slab

    Contractor Uses Bait System For Termite

    Inspected by Troy Crews

  7. Jul 23, 2021

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  8. Jul 26, 2021

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  9. Aug 19, 2021

    Failed: Building - Framing

    Porch Post Not Flat Strapped

    Inspected by Troy Crews

  10. Aug 19, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  11. Aug 19, 2021

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  12. Aug 19, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  13. Aug 20, 2021

    Passed: Building - Framing

    Post Have Simpson Screws Installed

    Inspected by Troy Crews

  14. Aug 30, 2021

    Passed: Building - Insulation

    Inspected by Troy Crews

  15. Sep 30, 2021

    Septic Release Inspection

    Inspected by Health Dept

  16. Oct 19, 2021

    Passed: Electrical - Permanent Power

    Inspected by Troy Crews

  17. Oct 19, 2021

    Release to power company

    Inspected by Troy Crews

  18. Jan 5, 2022

    Passed: Building - Final

    Inspected by Troy Crews