Permit Details

Permit Search

Permit

New Residential Construction

589 NW BRIDGEWATER TER
LAKE CITY, FL 32055

Permit #
000042004
Application #
49120
Status Completed
  1. Submitted Apr 23, 2021
  2. Issued May 26, 2021
  3. Expires Dec 20, 2022
  4. Completed Jun 29, 2022

Property

Parcel #
02275-113
Owner
Scheffler Dean A & Melodee
Acres
2.06
Subdivision
Cobblestone Unit 1
Zoning
RR
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
163'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0283D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
2168
Total Area (Sqft)
3331
Building Height
19
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0439
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Application pending.
  2. Point Review - On Hold-Incomplete
  3. Point Review - Printed-Online Application
  4. Zoning Review - Reviewed
  5. Zoning Review - Reviewed
  6. Plan Review - Reviewed
  7. Zoning Review - Reviewed
  8. Final Review - Reviewed
  9. Final Review - Payment Needed
  10. Permit Issued
  11. Final Review - Payment Needed

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor

Inspections

  1. Jul 14, 2021

    Passed: Electrical - Temporary Service

    Inspected by Anthony Aslan

  2. Jul 14, 2021

    Release to power company

    Inspected by Anthony Aslan

  3. Sep 13, 2021

    Passed: Building - Footer

    Install Grade Stakes Prior To Pour

    Inspected by Troy Crews

  4. Sep 13, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  5. Oct 15, 2021

    Failed: Plumbing/Gas - 1st Underground Rough–In

    Not Ready

    Inspected by Anthony Aslan

  6. Oct 18, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  7. Oct 20, 2021

    Passed: Building - Slab

    Inspected by Anthony Aslan

  8. Dec 15, 2021

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  9. Dec 15, 2021

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  10. Jan 3, 2022

    Failed: Building - Framing

    -anchors Missing At Bottom Plate Splices, Garage And House -need Engineer Clarification On Garage Bottom Plate Drawings Show Double Plate, Also Need Clarification On Truss To Header Strapping. need Clarification On Gable Detail Shows Lsta30 Strap On Lateral Bracing, Installed Is Flat Strapping Gable. -girder Truss Missing Htt5-kt, And Stud Packs -truss T03 Strapping Does Not Meet Uplift -t14, 15, 16 Missing Lateral Engineering

    Inspected by Anthony Aslan

  11. Jan 24, 2022

    Cancelled: Building - Framing

    Inspected by Anthony Aslan

  12. Feb 11, 2022

    Passed: Building - Framing

    Correction Made

    Inspected by Anthony Aslan

  13. Feb 22, 2022

    Failed: Building - Insulation

    Need To Schedule Mech, Plumbing, Electrical Rough

    Inspected by Anthony Aslan

  14. Feb 23, 2022

    Failed: Plumbing/Gas - 2nd Rough-In

    Refrigerator Supply Line Not Connected

    Inspected by Anthony Aslan

  15. Feb 23, 2022

    Failed: Mechanical - Rough In

    Ever Supply And Return Needs To Be Pulled Back Sealed On Inter Liner, Needs To Be Inspected Before Out Liner Is Sealed table C403.2.9.2duct System Construction And Sealing

    Inspected by Anthony Aslan

  16. Feb 23, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  17. Feb 23, 2022

    Failed: Building - Insulation

    All Trades Need To Be Corrected Before Insulation Is Passed

    Inspected by Anthony Aslan

  18. Feb 28, 2022

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  19. Feb 28, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  20. Apr 27, 2022

    Septic Release Inspection

    Inspected by Health Dept

  21. Jun 1, 2022

    Passed: Electrical - Permanent Power

    Inspected by Anthony Aslan

  22. Jun 1, 2022

    Release to power company

    Inspected by Anthony Aslan

  23. Jun 23, 2022

    Passed: Building - Final

    Need Blower Door, Back Door Hits Wall Water Heater, Need All Exhaust Openings In Soffit Grills Installed, Kitchen Exhaust Pipe - M1503.1general. range Hoods Shall Discharge To The Outdoors Through A Duct. The Duct Serving The Hood Shall Have A Smooth Interior Surface, Shall Be Air Tight, Shall Be Equipped With A Back-draft Damper And Shall Be Independent Of All Other Exhaust Systems. Ducts Serving Range Hoods Shall Not Terminate In An Attic Or Crawl Space Or Areas Inside The Building.

    Inspected by Anthony Aslan

  24. Jun 29, 2022

    Certificate-Release Certificate

    Rec'd Docs & Pictures

    Inspected by Anthony Aslan

Documents