Permit Details

Permit Search

Permit

New Residential Construction

215 SW CHERRY BLOSSOM WAY
LAKE CITY, FL 32024

Permit #
000041982
Application #
48619
Status Completed
  1. Submitted Mar 11, 2021
  2. Issued May 21, 2021
  3. Expires Aug 23, 2022
  4. Completed Feb 24, 2022

Property

Parcel #
03011-122
Owner
Stanley Crawford Construction
Acres
0.30
Subdivision
Rose Pointe
Zoning
PRD
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
104'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0289D
This is the construction of a
Single Family Dwelling
Setbacks Front
20'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1293
Total Area (Sqft)
1904
Building Height
18.5
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0270
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. Application pending.
  2. Point Review - On Hold-Incomplete
  3. Point Review - Printed-Online Application
  4. Zoning Review - Corrections Needed
  5. Plan Review - Reviewed
  6. Zoning Review - Corrections Needed
  7. Zoning Review - Reviewed
  8. Final Review - Reviewed
  9. Final Review - Payment Needed
  10. Final Review - Payment Needed
  11. Final Review - Payment Needed
  12. Permit Issued
  13. Final Review - Payment Needed

Contractors

  • Kenneth Ault

    Kenneth Edward Ault Plumbing Inc

    License
    CFC1429807
    Title
    Cert. Plumbing
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

  • Ralph W Laverdure

    Rwl Roofing,llc.

    License
    CCC1328590
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Donald R Davis

    High Springs Electric Inc

    License
    CAC1815367
    Title
    Class B A/c
    Role
    Subcontractor
  • Donald R Davis

    High Springs Electric Inc

    License
    CAC1815367
    Title
    Class B A/c
    Role
    Subcontractor
  • William S Crawford

    Stanley Crawford Construction Inc

    License
    RG0042896
    Title
    General Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

Inspections

  1. Jun 3, 2021

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Jun 3, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Jun 28, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  4. Jul 8, 2021

    Passed: Building - Slab

    Inspected by Matt Forsyth

  5. Sep 14, 2021

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  6. Sep 14, 2021

    Release to power company

    Inspected by Matt Forsyth

  7. Oct 15, 2021

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  8. Oct 15, 2021

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  9. Nov 9, 2021

    Passed: Building - Framing

    Inspected by Matt Forsyth

  10. Nov 9, 2021

    Failed: Mechanical - Rough In

    No Mechanical Work Started

    Inspected by Matt Forsyth

  11. Nov 17, 2021

    Passed: Mechanical - Rough In

    Need Electrical Inspection And Plumbing Before Insulation

    Inspected by Troy Crews

  12. Nov 23, 2021

    Cancelled: Mechanical - Rough In

    Inspected by Troy Crews

  13. Nov 24, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  14. Nov 24, 2021

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Tub Water Tested

    Inspected by Matt Forsyth

  15. Nov 30, 2021

    Passed: Building - Insulation

    Walls Only

    Inspected by Matt Forsyth

  16. Jan 28, 2022

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Matt Forsyth

  17. Feb 9, 2022

    Release to power company

    Inspected by Melissa Garber

  18. Feb 9, 2022

    Septic Release Inspection

    Inspected by Health Dept

  19. Feb 23, 2022

    Failed: Building - Final

    Need Blower Door Doc Need Ceiling Insulation Replace Old Breaker In Panel (reset Not Working

    Inspected by Matt Forsyth

  20. Feb 24, 2022

    Passed: Building - Final

    Inspected by Matt Forsyth

Documents