Permit Details

Permit Search

Permit

New Commercial Construction

4782 NW SUWANNEE VALLEY RD
LAKE CITY, FL 32055

Permit #
000041947
Application #
49095
Status Completed
  1. Submitted —
  2. Issued May 19, 2021
  3. Expires Jul 24, 2022
  4. Completed Jan 25, 2022

Property

Parcel #
00109-000
Owner
Florida Power & Light Company
Acres
132.34
Subdivision
—
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Accessory Use
Finished floor requirement
NONE Non-Habitable Structure
Fema map number
12023C0170D
This is the construction of a:
OPEN viewing platform
Driveway access to property:
Existing Drive
Is there a Fire Sprinkler System?
No
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setback Rear
25'
Stories
1
Heated Area (Sqft)
0
Total Area (Sqft)
315
Building Height
27.6
Building Code Construction Type
II
Building Code Element
B
Building Code Occupancy Types
Assembly
Occupancy Use Title
OPEN PLATFORM
Dev Permit #
F023-
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
x21
Sealed roof decking options. (Must select one.)
Other (explain)
Sealed roof decking explanation for other option.
n/a

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Zoning Review - Reviewed
  4. Plan Review - Documents Required
  5. Plan Review - Reviewed
  6. Permit Issued

Contractors

  • David E Mangrum

    Mangrum Construction Inc

    License
    CGC1513670
    Title
    General Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Jul 13, 2021

    Rescheduled 7/14/2021:Building - Footer

    Inspected by Troy Crews

  2. Jul 13, 2021

    Rescheduled 7/14/2021:Engineering - Setbacks

    Inspected by Troy Crews

  3. Jul 14, 2021

    Passed: Building - Footer

    Inspected by Troy Crews

  4. Jul 14, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  5. Oct 21, 2021

    Passed: Building - Footer

    Two 5 By 5 Interior Pads With 12 Inch Long Anchor Bolts With Welded Bottoms.

    Inspected by Troy Crews

  6. Oct 21, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  7. Jan 25, 2022

    Passed: Building - Final

    D.ot. To Complete Sidewalk Connection In Future.

    Inspected by Troy Crews