Permit Details

Permit Search

Permit

New Residential Construction

874 SW MANDIBA DR
LAKE CITY, FL 32024

Permit #
000041852
Application #
48351
Status Completed
  1. Submitted Apr 16, 2021
  2. Issued May 5, 2021
  3. Expires Aug 16, 2022
  4. Completed Feb 21, 2022

Property

Parcel #
09280-174
Owner
Drawdy, Lance And Kelsee
Acres
1.02
Subdivision
Oaks Of Lake City Phase 2
Zoning
PRRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
89'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0395C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2202.8
Total Area (Sqft)
3493.9
Building Height
24
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0200
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Zoning Review - Reviewed
  5. Plan Review - Documents Required
  6. Plan Review - Documents Required
  7. Plan Review - Reviewed
  8. Final Review - Reviewed
  9. Final Review - Payment Needed
  10. Permit Issued
  11. Final Review - Payment Needed

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor

Inspections

  1. Jun 17, 2021

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Jun 17, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Jul 14, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  4. Jul 22, 2021

    Passed: Building - Slab

    Inspected by Anthony Aslan

  5. Aug 13, 2021

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  6. Aug 13, 2021

    Release to power company

    Inspected by Troy Crews

  7. Aug 19, 2021

    Passed: Building - Wall Sheathing

    Inspected by Troy Crews

  8. Sep 10, 2021

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  9. Sep 29, 2021

    Passed: Building - Framing

    Inspected by Troy Crews

  10. Sep 29, 2021

    Failed: Mechanical - Rough In

    Not Complete

    Inspected by Troy Crews

  11. Oct 20, 2021

    Cancelled: Building - Framing

    Inspected by Troy Crews

  12. Oct 21, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  13. Oct 21, 2021

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  14. Nov 4, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  15. Nov 9, 2021

    Passed: Building - Insulation

    Inspected by Troy Crews

  16. Jan 26, 2022

    Failed: Electrical - Permanent Power

    Need Door Locks, Wires At Baseboard In Garage Need Protection.

    Inspected by Troy Crews

  17. Jan 27, 2022

    Passed: Electrical - Permanent Power

    Need Septic Final, Locks Installed Wire Protected.

    Inspected by Troy Crews

  18. Feb 2, 2022

    Release to power company

    Inspected by Melissa Garber

  19. Feb 2, 2022

    Septic Release Inspection

    Inspected by Health Dept

  20. Feb 17, 2022

    Passed: Building - Final

    Inspected by Troy Crews

Documents