Permit Details

Permit Search

Permit

New Residential Construction

868 SW CUMBERLAND ST
FORT WHITE, FL 32038

Permit #
000041781
Application #
48665
Status Completed
  1. Submitted Oct 22, 2021
  2. Issued Apr 22, 2021
  3. Expires Feb 22, 2022
  4. Completed Jan 3, 2022

Property

Parcel #
04226-159
Owner
Mendez Cristobal & Medina Audrey P
Acres
10.00
Subdivision
Shiloh Ridge Unr
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
53' AND ABOVE THE HIGHEST NATURAL GRADE AT THE SITE
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0490C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
560
Total Area (Sqft)
560
Building Height
18
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0322
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Zoning Review - Reviewed
  4. Plan Review - Documents Required
  5. Plan Review - Documents Required
  6. Plan Review - Documents Required
  7. Plan Review - Reviewed
  8. Zoning Review - Reviewed
  9. Final Review - Reviewed
  10. Permit Issued

Contractors

This is an owner-builder project.

Inspections

  1. Apr 26, 2021

    Failed: Plumbing/Gas - 1st Underground Rough–In

    Need Pressure Gauge Installed On Laundry Supply. Need Nail Guards.

    Inspected by Anthony Aslan

  2. Apr 26, 2021

    Failed: Electrical - 1st Underground Rough–In

    Need Nail Guards

    Inspected by Anthony Aslan

  3. Apr 26, 2021

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  4. Apr 26, 2021

    Failed: Building - Footer

    Need Pictures Of Footers. Need Engineer Letter On Wall Stud Framing And Floor Joist 2x6 Used Plans Call For 3 Ply 2x8.

    Inspected by Anthony Aslan

  5. Jul 20, 2021

    Septic Release Inspection

    Inspected by Health Dept

  6. Jul 20, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  7. Jul 20, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  8. Aug 26, 2021

    Passed: Building - Insulation

    Inspected by Anthony Aslan

  9. Aug 26, 2021

    Passed: Mechanical - Rough In

    Dryer. Not Complete

    Inspected by Anthony Aslan

Documents