Permit Details

Permit Search

Permit

New Residential Construction

224 SW CEDARWOOD GLN
LAKE CITY, FL 32025

Permit #
000041760
Application #
48767
Status Completed
  1. Submitted Mar 28, 2021
  2. Issued Apr 19, 2021
  3. Expires Aug 21, 2022
  4. Completed Feb 23, 2022

Property

Parcel #
09415-109
Owner
Mueller Tamela Illene & Mueller Lavern Allen
Acres
5.01
Subdivision
Magnolia Place
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
HIGHER OF ELEVATION 116' OR 1 FOOT ABOVE THE ROADWAY OR 8 INCHES ABOVE THE HIGHEST ADJACENT GRADE
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
NA
Fema map number
12023C0415C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
30'(utility easement)
Stories
1
Heated Area (Sqft)
2436
Total Area (Sqft)
3713
Building Height
28
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0305

Status & Review History

  1. Application pending.
  2. Point Review - On Hold-Incomplete
  3. Point Review - Printed-Online Application
  4. Zoning Review - Reviewed
  5. Plan Review - Reviewed
  6. Zoning Review - Reviewed
  7. Final Review - Payment Needed
  8. Permit Issued
  9. Final Review - Payment Needed

Contractors

  • Daniel Weiland

    D. Weiland Plumbing,llc.

    License
    CFC1426221
    Title
    Plumbing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance Expired.

  • Lee A Holloway

    Ldm Construction Company Inc & Peninsular Electric Co

    License
    CGC1510178
    Title
    General Contractor
    Role
    Contractor

    County License & State License & Workers Comp Expired.

  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor
  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor

Inspections

  1. Apr 23, 2021

    Failed: Electrical - Temporary Service

    Needs New Weatherhead

    Inspected by Troy Crews

  2. Apr 26, 2021

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  3. Apr 26, 2021

    Release to power company

    Inspected by Troy Crews

  4. Jun 1, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  5. Jun 14, 2021

    Passed: Building - Monolithic Slab

    Inspected by Troy Crews

  6. Jun 14, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  7. Jun 14, 2021

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Troy Crews

  8. Jun 14, 2021

    Cancelled: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  9. Aug 9, 2021

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Troy Crews

  10. Aug 9, 2021

    Passed: Building - Roof Decking

    Contractor Has Shown Floor To Be 1ft. Above Rd.

    Inspected by Troy Crews

  11. Aug 31, 2021

    Failed: Building - Framing

    Several Anchor Bolts Missing, Call Back In With Mechanicals

    Inspected by Troy Crews

  12. Sep 7, 2021

    Passed: Building - Framing

    Inspected by Troy Crews

  13. Sep 7, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  14. Sep 7, 2021

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  15. Sep 7, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  16. Sep 24, 2021

    Passed: Building - Insulation

    Inspected by Troy Crews

  17. Dec 7, 2021

    Passed: Electrical - Permanent Power

    Need Septic Final

    Inspected by Troy Crews

  18. Dec 8, 2021

    Release to power company

    Inspected by Melissa Garber

  19. Dec 8, 2021

    Septic Release Inspection

    Inspected by Health Dept

  20. Feb 22, 2022

    Passed: Building - Final

    Inspected by Troy Crews

Documents