Mobile Home
Permit
| Application #: | 48629 |
| Permit #: |
000041542 |
| Related Permit: |
|
| Submitted: | Thursday, March 4, 2021 |
| Issued: | Thursday, March 18, 2021 |
| Expires: | Friday, April 9, 2021 |
| Completed: | Friday, April 9, 2021 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0480C |
| In floodway |
N |
| Mobile Home is a: |
Double Wide |
| Year Built |
2021 |
| Width (Ft.In) |
32 |
| Length (Ft.In) |
60 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
65788 |
| Special temporary use permit number: |
STUP2103-14 |
| Septic # |
21-0208 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
Yes |
| Serial # |
LOHGA10021676AB |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
Review Notes
| 3/4/2021 |
Application pending. |
| 3/4/2021 |
Point Review - Printed-Online Application |
| 3/8/2021 |
Zoning Review - Documents Required |
| 3/10/2021 |
Plan Review - Reviewed |
| 3/10/2021 |
Zoning Review - Reviewed |
| 3/11/2021 |
Final Review - Documents Required |
| 3/18/2021 |
Final Review - Payment Needed |
| 3/18/2021 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Michael A Boland Ace A/c Of Ocala Llc
|
CAC1817716 |
Cert Class B A/c |
Subcontractor |
Brent M Strickland
|
IH1104218 |
Mh Installer (ih) |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Septic Release Inspection |
|
Health Dept |
3/9/2021 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
No Install Decal |
Matt Forsyth |
4/8/2021 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
4/8/2021 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Matt Forsyth |
4/9/2021 |
| Release to power company |
|
Matt Forsyth |
4/9/2021 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
4/9/2021 |