Permit Details

Permit Search

Permit

Mobile Home

199 NE JAMES AVE
LAKE CITY, FL 32055

Permit #
000041499
Application #
48476
Status Completed
  1. Submitted —
  2. Issued Mar 10, 2021
  3. Expires Nov 7, 2021
  4. Completed May 11, 2021

Property

Parcel #
06500-000
Owner
Capallia Dana & Frank
Acres
2.98
Subdivision
Highland Estates
Zoning
CI
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0305D
In floodway
N
Mobile Home is a:
Double Wide
Year Built
1999
Width (Ft.In)
28
Length (Ft.In)
64
Driveway access to home:
Existing Drive
Installation Decal #
76249
Septic #
21-0174
Setbacks Front
20'
Setback Side 1
5'
Setbacks Rear
15'
Dev Permit #
F023-
Setback Side 2
5'
Are you applying for a 5 year temporary permit?
No
Serial #
gafl24665ab
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Zoning Review - On Hold-Incomplete
  2. Plan Review - Reviewed
  3. Point Review - Printed-Online Application
  4. Zoning Review - Reviewed
  5. Final Review - Payment Needed
  6. Permit Issued

Contractors

  • Rodney A Carmichael

    Set Right Mobile Homes Llc

    License
    IH1025656
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Mar 2, 2021

    Septic Release Inspection

    Inspected by Health Dept

  2. Apr 23, 2021

    Failed: Mobile Home - Mobile Home Set-Up Final

    Rear Step Treads Not Wide Enough, Also Needs At Least One Handrail Four Risers. Place Straps From Ac To Pad, And Protect Duct Work By Moving Unit Closer To House.

    Inspected by Troy Crews

  3. Apr 23, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  4. Apr 28, 2021

    Passed: Mobile Home - Mobile Home Set-Up Final

    Items Correected

    Inspected by Troy Crews

  5. Apr 28, 2021

    Release to power company

    Inspected by Troy Crews

  6. Apr 28, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  7. May 7, 2021

    Failed: Electrical - Service Upgrade Final

    Covers Missiing

    Inspected by Troy Crews

  8. May 11, 2021

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Troy Crews

  9. May 11, 2021

    Release to power company

    Inspected by Troy Crews

  10. May 11, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews