Mobile Home
Permit
| Application #: | 48015 |
| Permit #: |
000041454 |
| Related Permit: |
|
| Submitted: | Saturday, December 19, 2020 |
| Issued: | Wednesday, March 3, 2021 |
| Expires: | Thursday, October 27, 2022 |
| Completed: | Thursday, October 27, 2022 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0380C |
| In floodway |
N |
| Mobile Home is a: |
Double Wide |
| Year Built |
2006 |
| Width (Ft.In) |
32 |
| Length (Ft.In) |
52 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
68064 |
| Septic # |
20-0844 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
GAFL575AB728505C21 |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
Review Notes
| 12/19/2020 |
Application pending. |
| 12/21/2020 |
Point Review - Printed-Online Application |
| 12/21/2020 |
Point Review - Reviewed |
| 12/22/2020 |
Zoning Review - Reviewed |
| 12/28/2020 |
Plan Review - Reviewed |
| 12/30/2020 |
Final Review - Documents Required |
| 3/3/2021 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Thomas E Butler Ii Butler Mobile Homes
County License & State License Expired. |
IH1026502 |
Mh Installer (ih) |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Failed: Mobile Home - In County Pre-Mobile Home before set-up |
No Data Plate Overall Mobile Home In Good Condition |
Matt Forsyth |
2/9/2021 |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
|
Matt Forsyth |
2/24/2021 |
| Septic Release Inspection |
|
Health Dept |
6/4/2021 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Need Duck Work Off Ground |
Matt Forsyth |
10/26/2022 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
10/26/2022 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Matt Forsyth |
10/27/2022 |
| Release to power company |
|
Matt Forsyth |
10/27/2022 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
10/27/2022 |