Permit Details

Permit Search

Permit

New Residential Construction

167 SW BEACON WAY
LAKE CITY, FL 32025

Permit #
000035998
Application #
36098
Status Completed
  1. Submitted Nov 15, 2017
  2. Issued Nov 15, 2017
  3. Expires Oct 13, 2018
  4. Completed Apr 16, 2018

Property

Parcel #
02951-111
Owner
Bullard Development Co
Acres
0.50
Subdivision
Amelia Landing
Zoning
PRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0293D
This is the construction of a
SFD, UTILITY
Setbacks Front
25.00
Setback Side 1
10.00
Setback Side 2
10.00
Setbacks Rear
15.00
Stories
1
Heated Area (Sqft)
1669.00
Total Area (Sqft)
2325.00
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
X CITY

Status & Review History

No status updates yet.

Contractors

  • Adam Papka

    License
    CBC1253409
    Title
    —
    Role
    —

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Nov 21, 2017

    Underslab Rough Plumbing Inspection

    Inspected by Troy Crews

  2. Nov 28, 2017

    Monolithic Slab Inspection

    Inspected by Tommy Matthews

  3. Nov 28, 2017

    Passed: Building - Slab

    Inspected by Tommy Matthews

  4. Dec 14, 2017

    Temporary Power Inspection

    Inspected by Troy Crews

  5. Dec 14, 2017

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  6. Dec 14, 2017

    Release to power company

    Inspected by Troy Crews

  7. Jan 9, 2018

    Failed: Building - Ext Strapping/Wall Sheathing

    Need To Install Post

    Inspected by Troy Crews

  8. Jan 9, 2018

    Failed: Building - Framing

    T-20 Truss Strap , Plate Splices(bolts),nail Straps.

    Inspected by Troy Crews

  9. Jan 24, 2018

    Failed: Building - Framing

    T=10 Truss Add Strap Outside Wall; 2 Anchor Bolts Same Outside Wall, Draft Stop Top Of Columns.

    Inspected by Troy Crews

  10. Jan 24, 2018

    Passed: Electrical - Rough In

    Inspected by Troy Crews

  11. Jan 24, 2018

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  12. Jan 24, 2018

    Passed: Plumbing/Gas - Rough In

    Inspected by Troy Crews

  13. Jan 30, 2018

    Passed: Building - Insulation

    Inspected by Troy Crews

  14. Jan 30, 2018

    Passed: Building - Framing

    Inspected by Troy Crews

  15. Mar 21, 2018

    Passed: Engineering - Final Driveway

    Private Rd

    Inspected by Cb

  16. Mar 21, 2018

    Passed: Electrical - Permanent Power

    Inspected by Troy Crews

  17. Mar 21, 2018

    Release to power company

    Inspected by Troy Crews

  18. Apr 11, 2018

    Failed: Building - Final

    Back Porch G.f.c.i. Connect Water Heater Drain Pan, Complete Dryer Vent, Blower Door Test Results Needed, Final Termite Certificate Needed.

    Inspected by Troy Crews

  19. Apr 16, 2018

    Passed: Building - Final

    Inspected by Troy Crews

  20. Apr 16, 2018

    CERTIFICATE OF OCCUPANCY/COMPLETION DATE

Documents