Permit
300 SW BISHOP AVENUELAKE CITY, FL 32024
This is an owner-builder project.
Timothy J. Bailey
Setback Inspection
Inspected by Troy Crews
Foundation Inspection
Underslab Rough Plumbing Inspection
Slab Inspection
Temporary Power Inspection
Sheeting and Nailing Inspection
Sheathing and Nailing Inspection
Electrical Rough-In Inspection
Passed: Electrical - Rough In
Failed: Mechanical - Rough In
Passed: Plumbing/Gas - Rough In
Partial
Passed: Mechanical - Rough In
Failed: Building - Framing
Need Header Straps And Anchor Bolts Added, Also Porch Post Need Anchor Ar Bottom
Passed: Building - Framing
Passed: Electrical - 2nd Rough-In
Main Conduit To Power Company
Failed: Building - Insulation
Need To Change Ceiling Insulation To R-30 Minimum
Passed: Building - Insulation
Passed: Electrical - Permanent Power
Need Septic Final
Release to power company
Septic Received
Passed: Building - Final
Final Pending Blower Door Test
Certificate-Release Certificate
Blower Door Recieved