Allows temporary power for construction use. Ref: NEC Art. 230
|
Please call to schedule these inspections due to a Flood Harzard Area.
|
|
|
Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5
|
Missing required documents on Floodplain Development Permit #69623.
|
|
|
Inspects reinforcement, vapor barrier, termite treatment, and plumbing prior to pour. Ref: FBC 110.3(1)
|
Please call to schedule these inspections due to a Flood Harzard Area.
|
|
|
Inspects drainage and water piping before backfill. Ref: FBC-P 312
|
Inspection was completed on 2026.03.24.
|
|
|
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
|
|
|
|
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
|
|
|
|
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
|
|
|
|
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
|
|
|
|
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
|
|
|
|
Conducted when required by the City to verify proper connection and availability of utility services. Ref: City of Lake City
|
Please call to schedule these inspections due to a Flood Harzard Area.
|
|
|
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
|
Please call to schedule these inspections due to a Flood Harzard Area. Missing required documents on Floodplain Development Permit #69623.
|
|
|
Full review of fire systems before occupancy. Ref: FBC 907
|
|
|
|
Ensures all zoning-related site requirements (buffers, landscaping, setbacks, parking) are satisfied before CO.
Columbia County LDR
|
Please call to schedule these inspections due to a Flood Harzard Area.
|
|
|
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
|
Please call to schedule these inspections due to a Flood Harzard Area.
|