Select Inspection Type Notes / Requirements
Allows temporary power for construction use. Ref: NEC Art. 230 Inspection was completed on 2026.02.02.
Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1) Inspection was completed on 2026.02.02.
Inspects drainage and water piping before backfill. Ref: FBC-P 312 Inspection was completed on 2026.02.16.
Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5 Inspection was completed on 2026.02.20.
Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1) Inspection was completed on 2026.02.20.
Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3) Inspection was completed on 2026.03.16.
Verifies wall sheathing, nailing, and exterior strapping per wind-load requirements. Ref: FBC 110.3, 1609 Inspection was completed on 2026.04.28.
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3) Inspection was completed on 2026.03.16.
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3) Inspection was completed on 2026.04.28.
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603 Inspection was completed on 2026.04.28.
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312 Inspection was completed on 2026.04.28.
Verifies water-tightness and slope before tile. Ref: FBC-P 312.9 Inspection was completed on 2026.04.28.
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3 Inspection was completed on 2026.04.28.
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5 Inspection was completed on 2026.05.06.
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5 Assessment is owed.

Message

Contact Us

Building Department

Office Hours

Monday-Friday
8:00 A.M. - 4:30 P.M.

Contact Information

Phone: 386-758-1008
Fax: 386-758-2160

Email: bldginfo@columbiacountyfla.com

Location

135 NE Hernando Ave.
Lake City, FL 32055 (opens in new window)

Mailing Address

P.O. Box 1529
Lake City, FL 32056-1529

Public Records

Public records policy and fees

Board of County Commissioners
Tel. (386) 758-1326
Fax: (386) 758-2182
Email: publicrecords@columbiacountyfla.com

Mailing Address:
P.O. Box 1529
Lake City, FL 32056-1529

Citizen Feedback

Let us know how we're doing

ADA Accessibility

Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the Columbia County ADA Coordinator at (386) 758-3344. You may also email that office at hr@columbiacountyfla.com and provide a brief description of the inaccessible feature.

Columbia County strives to provide reasonable accommodations to help people with disabilities have an equal opportunity to participate in our public meetings. Please notify our ADA Coordinator at least 48 hours prior to the public meeting by calling (386) 758-3344.