Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
|
Inspection was completed on 2025.10.27.
|
|
|
Reviews hurricane straps, anchors, and connections, for uplift resistance. Ref: FBC 1609
|
Inspection was completed on 2025.10.27.
|
|
|
Verifies fastening of windows/doors for impact and wind load compliance. Ref: FBCR 609
|
Inspection was completed on 2025.10.27.
|
|
|
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
|
Inspection was completed on 2025.10.27.
|
|
|
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
|
Inspection was completed on 2025.11.21.
|
|
|
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
|
Inspection was completed on 2025.11.21.
|
|
|
Verifies water-tightness and slope before tile. Ref: FBC-P 312.9
|
Inspection was completed on 2025.11.21.
|
|
|
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
|
Inspection was completed on 2025.12.04.
|
|
|
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
|
Inspection was completed on 2025.12.12.
|
|
|
Checks stucco lath, weep screeds, and moisture barriers before application. Ref: FBC 110.3
|
|
|
|
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
|
Inspection was completed on 2026.04.06.
|
|
|
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
|
Final must be passed prior to scheduling.
|