Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5
|
Inspection was completed on 2025.01.21.
|
|
|
Inspects drainage and water piping before backfill. Ref: FBC-P 312
|
Inspection was completed on 2025.01.13.
|
|
|
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
|
Inspection was completed on 2025.07.01.
|
|
|
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
|
Inspection was completed on 2025.07.01.
|
|
|
Ensures driveway construction complies with Florida Department of Transportation standards when accessing a state-maintained road. Ref: FDOT Standard Index, Columbia County LDR 4.2.3
|
|
|
|
Verifies wall sheathing, nailing, and exterior strapping per wind-load requirements. Ref: FBC 110.3, 1609
|
Inspection was completed on 2025.03.14.
|
|
|
Confirms fire-related wall assemblies meet UL/FBC details and penetrations are properly sealed. Ref: FBC 703
|
|
|
|
Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
|
|
|
|
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
|
Inspection was completed on 2025.03.18.
|
|
|
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
|
Inspection was completed on 2025.07.17.
|
|
|
Checks stucco lath, weep screeds, and moisture barriers before application. Ref: FBC 110.3
|
|
|
|
Ensures lintel/tie beam reinforcing steel and anchorage are correct before pour. Ref: FBC 110.3
|
|
|
|
Confirms vertical and horizontal reinforcing per engineered plans. Ref: FBC 2122.2
|
|
|
|
Inspects reinforcement, vapor barrier, termite treatment, and plumbing prior to pour. Ref: FBC 110.3(1)
|
Inspection was completed on 2025.01.21.
|
|
|
Verifies fastening and components for fire-rated walls, ceilings, or roofs. Ref: FBC 703
|
|
|
|
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
|
Inspection was completed on 2025.03.14.
|
|
|
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
|
Inspection was completed on 2025.07.01.
|
|
|
Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1)
|
|
|
|
Reviews hurricane straps, anchors, and connections, for uplift resistance. Ref: FBC 1609
|
Inspection was completed on 2025.03.14.
|
|
|
Allows temporary power for construction use. Ref: NEC Art. 230
|
Inspection was completed on 2025.04.22.
|
|
|
Verifies water-tightness and slope before tile. Ref: FBC-P 312.9
|
Inspection was completed on 2025.07.01.
|
|
|
Checks filled masonry cells or columns for reinforcing and grout. Ref: FBC 2122.2
|
|
|
|
Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
|
Inspection was completed on 2025.03.14.
|
|
|
Verifies fastening of windows/doors for impact and wind load compliance. Ref: FBCR 609
|
Inspection was completed on 2026.04.06.
|
|
|
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
|
|
|
|
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
|
Inspection was completed on 2026.04.01.
|