Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1)
|
Inspection was completed on 2025.12.17.
|
|
|
Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5
|
|
|
|
Inspects drainage and water piping before backfill. Ref: FBC-P 312
|
Inspection was completed on 2025.11.04.
|
|
|
Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
|
|
|
|
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
|
|
|
|
Verifies fastening of windows/doors for impact and wind load compliance. Ref: FBCR 609
|
|
|
|
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
|
Framing must be passed prior to scheduling.
|
|
|
Verifies water-tightness and slope before tile. Ref: FBC-P 312.9
|
|
|
|
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
|
Framing must be passed prior to scheduling.
|
|
|
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
|
Framing must be passed prior to scheduling.
|
|
|
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
|
|
|
|
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
|
|
|
|
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
|
Assessment is owed.
|